soft-shell crab exportersoftshell crab exporterVietnam crab exporterVietnamese mud crab export

Thailand’s net-zero push puts nuclear, carbon capture and EVs in focus

WEDNESDAY, NOVEMBER 25, 2026
Thailand’s net-zero push puts nuclear, carbon capture and EVs in focus

EGAT, PTT, WHA and Energy Absolute outline Thailand’s net-zero transition through nuclear power, carbon capture, hydrogen and commercial electric vehicles.

  • To achieve its net-zero target, Thailand is focusing on technologies beyond renewables, including nuclear power, carbon capture and electric vehicles (EVs), to maintain economic competitiveness.
  • The state utility, EGAT, is exploring small modular reactors (SMRs) as a long-term nuclear energy solution to replace fossil fuel power plants.
  • Energy company PTT is championing carbon capture and storage (CCS) as an essential technology, assessing storage potential in the Gulf of Thailand to help key industries reduce their emissions.
  • The adoption of commercial EVs is being accelerated, with companies highlighting their increasing economic viability and promoting solutions such as battery swapping and leasing models.

Thailand’s transition to net zero will require more than renewable energy and improvements in energy efficiency, with energy and industry leaders highlighting nuclear power, carbon capture, hydrogen and commercial electric vehicles (EVs) as key technologies for cutting emissions while maintaining economic competitiveness.

Executives from the Electricity Generating Authority of Thailand (EGAT), PTT, WHA Group and Energy Absolute (EA) shared their strategies during the “One Mission, Collective Action” opening session at the “Sustainability Forum 2027 – The Race Against Global Warming”, hosted by Bangkokbiznews on Wednesday (November 25).

The discussion underscored the need to balance energy security, environmental sustainability and commercial viability while accelerating the adoption of technologies capable of delivering substantial emissions reductions.

Siriwat Chedsi, Deputy Governor – Power Plant Development and Renewable Energy at EGAT

EGAT explores nuclear power as a long-term energy solution

Siriwat Chedsi, Deputy Governor – Power Plant Development and Renewable Energy at EGAT, outlined the state utility’s strategy to shift gradually from fossil fuels towards renewable energy and green electricity under Thailand’s draft Power Development Plan (PDP).

Floating solar projects at EGAT’s dams are among its flagship initiatives. The utility is also studying hydrogen co-firing at existing power plants to reduce fossil fuel consumption, alongside pumped-storage hydropower and battery energy storage systems to maintain grid stability.

Looking further ahead, Siriwat identified small modular reactors (SMRs) as an important long-term option for replacing fossil fuel-fired baseload power plants.

EGAT’s proposed SMR development plan includes site assessments in accordance with International Atomic Energy Agency (IAEA) standards, with safety remaining the overriding priority. The utility is exploring technologies from the United States, Europe, Japan, South Korea and China.

Although SMR development costs remain relatively high, Siriwat noted that current estimates suggest the technology is broadly competitive with other power generation options.

“EGAT estimates that as SMR technology becomes more widely adopted globally, costs will gradually decline,” he explained.

EGAT is also promoting green electricity use among businesses through direct power purchase agreements (direct PPAs) and the Utility Green Tariff (UGT).

Dr Natthakorn Kraikul, Executive Vice President, Sustainability Strategy and Management at PTT Public Company Limited

PTT sees carbon capture and hydrogen as key to competitiveness

Dr Natthakorn Kraikul, Executive Vice President, Sustainability Strategy and Management at PTT Public Company Limited, emphasised the importance of balancing national energy security with Thailand’s net-zero ambitions.

He stressed that securing uninterrupted energy supplies takes priority during periods of geopolitical conflict. However, improving efficiency and adopting clean energy alone will not be sufficient to achieve the country’s net-zero goals.

Natthakorn identified carbon capture and storage (CCS) and hydrogen as essential technologies for overcoming limitations in existing industrial and energy production processes.

Despite existing regulatory and infrastructure challenges, Natthakorn warned that delaying the development of these technologies could undermine Thailand’s ability to compete internationally.

PTT is pooling its expertise in geology, technology and law, while working with government agencies to assess technical and regulatory readiness and develop infrastructure to support Thailand’s key industries.

Its priorities include:

  • Carbon capture and storage (CCS): Assessing carbon storage potential in the Gulf of Thailand, including geological conditions and carbon transport infrastructure, with the aim of having CCS infrastructure in place in time to support the country’s emissions reduction targets.
  • Hydrogen: Focusing on pilot projects before 2035, given the high cost of adapting existing gas pipelines for hydrogen blending and the relatively high price of hydrogen. Widespread commercial deployment will depend on further technological advances.

Natthakorn emphasised that PTT’s clean energy infrastructure is intended not only to support its own operations but also to protect the competitiveness of industries that drive Thailand’s economy.

Natthapatt Tanboon-ek, Group Chief Financial Officer of WHA Corporation Public Company Limited (WHA Group)

WHA: Green technology must be commercially viable and scalable

Natthapatt Tanboon-ek, Group Chief Financial Officer of WHA Corporation Public Company Limited (WHA Group), argued that environmental initiatives deliver their greatest impact when they are economically viable and can be rapidly scaled up.

WHA is applying smart technologies across its industrial estates, including AI-powered traffic and security management, smart utility systems and water leak detection.

Natthapatt estimated that WHA had achieved around 50% of its green industrial estate goal, although reaching net zero across the entire system remains a long-term ambition.

The group’s approach is to accelerate the adoption of commercially viable green technologies, allowing environmental benefits to be achieved on a larger scale.

He highlighted several practical applications of this approach:

  • Rooftop solar: An increasingly attractive solution for businesses seeking to reduce electricity costs and emissions.
  • Commercial EVs: Electric pick-up trucks travelling around 150 kilometres a day are becoming economically viable at current fuel prices.
  • Battery swapping: Operators of heavy-duty electric trucks can swap depleted batteries in around five minutes, avoiding lengthy charging stops. Some Thai operators have begun trialling the technology.
  • Water recycling: WHA already recycles around 50% of its wastewater, with some customers, particularly high-tech industries and data centres, willing to pay a premium for high-quality recycled water.

Natthapatt added that foreign investors looking to relocate production to Thailand would be willing to purchase electricity at SMR-generated power prices, provided they were guaranteed a clean electricity supply within industrial estates.

“The important thing is to focus on what each of us can do and take action immediately,” he stressed.

Mongkol Kijlerdphon, Director of Sustainable Development at Energy Absolute Public Company Limited

Energy Absolute advocates leasing to accelerate commercial EV adoption

Mongkol Kijlerdphon, Director of Sustainable Development at Energy Absolute Public Company Limited, identified energy and transport as priority sectors for emissions reduction, noting that they account for most of Thailand’s greenhouse gas emissions.

Despite higher upfront investment costs than conventional vehicles, commercial EVs are becoming more financially viable, with operating cost savings amid volatile oil prices helping to shorten payback periods.

“The challenge with commercial EVs is no longer the vehicles themselves. It is whether business operators have the courage to change so their businesses can survive,” he remarked.

Mongkol identified three key conditions for successful adoption: investment costs proportionate to operating revenue, charging infrastructure that minimises operational downtime, and battery technologies that extend battery life, supported by comprehensive recycling management.

EA takes an integrated approach to commercial EVs, encompassing battery assembly, vehicle assembly, charging infrastructure and after-sales services.

As an example, Mongkol cited EA’s project involving approximately 1,520 electric buses ready for delivery to the Bangkok Mass Transit Authority (BMTA), intended to serve around 124 routes in Bangkok.

He also advocated shifting from traditional vehicle ownership towards leasing, supported by long-term contracts and additional services. Such arrangements could enable transport operators and financial institutions to plan more effectively.

For commercial electric buses and trucks, Mongkol estimated that an operating range of 200–300 kilometres is currently economically viable. However, longer-distance transport remains challenging, as larger and heavier batteries reduce cargo capacity and increase costs.

“We cannot tackle environmental issues alone,” Mongkol concluded, calling for greater collaboration between businesses, educational institutions and government agencies to address environmental challenges and strengthen Thailand’s economy.